Projects

Here some of our rapid prototype and series projects, manufactured with 3D Printing, CNC Machining, Silicone Mold, Injection Mold and Sheet Metal.

Hover Box Element

DURALUMINIUM CNC MACHINING

7075 aluminum prototypes manufactured by CNC Machining

Lead time: 14 days

Hover Box Element

PLASTIC INYECTION SET

Plastic parts production by 10K shots injection mold.

Lead time: 43 days

Hover Box Element

VACUUM CASTING LOW VOLUME PRODUCTION

Vacuum casting low volume production.

Lead time: 13 days

Hover Box Element

CNC MACHINED ALUMINIUM

Prototypes of anodized aluminum in black manufactured by CNC machining.

Manufacturing time: 10 days

Hover Box Element

MULTI JET FUSION PA12+GB PARTS

PA12 + Glass Beats parts manufactured by Multi Jet Fusion (MJF), 3D printing.

Lead time: 6 days

Hover Box Element

REALISTIC PROTOTYPE

CNC machining prototype with realistic finishes. The housings have a satin paint that looks very much like the MT-11020 mold texture. Manufacturing time: 7 days

Hover Box Element

SHORT SERIE

Low volume production parts using aluminum molds.

Manufacturing time: 28 days

Hover Box Element

TOPOLOGY PROTOTYPE

Generative engineering prototype created by using topological calculation and manufactured by HP Multi Jet Fusion (MJF), 3D printing.

Manufacturing time: 1 days

Hover Box Element

HASCO PLASTIC INJECTION MOLD

High volume production of plastic molded parts made by 50k shots injection mold.

Manufacturing time: 41 days

Hover Box Element

SLS LOW VOLUME PRODUCTION

Selective laser sintering (SLS) low volume production.

Manufacturing time: 1 days

Hover Box Element

VACUUM CASTING MOLD

Silicone made vacuum casting mold for a short series of 12 units.

Lead time: 10 days

Hover Box Element

DOUBLE INJECTION

Fabricación masiva de piezas bi-material ABS + PC y TPE mediante molde de doble inyección.

Tiempo de fabricación: 65 días

Hover Box Element

REALISTIC MODEL

Visual model of a 1:12 scale conceptual vehicle. The set consists of 34 different pieces with excellent finishes. Manufacturing time: 15 days

Hover Box Element

MOTOCYCLE MACHINING PARTS

Motorcycle parts manufactured by CNC machining.

Lead time: 9 days

Hover Box Element

INJECTION MOLD

ABS plastic massive production with asian standard injection mold.

Manufacturing time: 32 days

Hover Box Element

FLEXIBLE SHORT SERIE

Flexible resin prototype made by silicone mold.

Lead time: 14 days

Hover Box Element

VC LOW VOLUME PRODUCTION

Vacuum casting low volume production (low glossy white painting).

Lead time: 15 days

Hover Box Element

INJECTED TRANSPARENT PLASTIC

Mass manufacturing of polycarbonate parts using injection mold.

Manufacturing time: 45 days

Hover Box Element

SHEET METAL PROTOTYPE

Aluminum sheet prototype laser cut, bent and punched by a single automated machine.

Manufacturing time: 7 days

Hover Box Element

MJF LOW VOLUME PRODUCTION

HP Multi Jet Fusion (MJF) low volume production.

Manufacturing time: 1 days

Hover Box Element

ABS PLASTIC INJECTION MOLD

ABS plastic injection mold with standard: Hasco.

Lead time: 35 days

DOWNLOAD OUR SERVICES CATALOG
Download
Iniciar Whatsapp